Access

You are not currently logged in.

Access your personal account or get JSTOR access through your library or other institution:

login

Log in to your personal account or through your institution.

Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand

Yunzeng Wang and Yigal Gerchak
Management Science
Vol. 42, No. 1 (Jan., 1996), pp. 130-137
Published by: INFORMS
Stable URL: http://www.jstor.org/stable/2633021
Page Count: 8
  • Download ($30.00)
  • Cite this Item
Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
Preview not available

Abstract

We investigate a production planning problem in a periodic review environment with variable production capacity, random yields, and uncertain demand. The implications of random yields and variable capacity for lot sizing previously have been explored separately, but not jointly. Many production environments are likely to be subject to both types of uncertainties. To minimize the total discounted expected costs (production, holding, and shortage costs), we formulate the problem as a stochastic dynamic program. For the finite-horizon problem, we prove that the objective function is quasi-convex and that the structure of the optimal policy is characterized by a single critical point for the initial stock level at each period. That is, if the initial stock is greater than this critical point, the optimal planned production is zero; otherwise, it is greater than zero. Expressions for solving the critical point and the optimal planned production are obtained. We further show that the solution for the finite-horizon problem converges to that of the infinite-horizon problem.

Page Thumbnails

  • Thumbnail: Page 
130
    130
  • Thumbnail: Page 
131
    131
  • Thumbnail: Page 
132
    132
  • Thumbnail: Page 
133
    133
  • Thumbnail: Page 
134
    134
  • Thumbnail: Page 
135
    135
  • Thumbnail: Page 
136
    136
  • Thumbnail: Page 
137
    137